Welcome to Computech Store | Cash on Delivery (COD) ❌ Not Available | Flexible EMI Finance Options Available | Shipping All Over India | B2B Billing Available | 100% New Genuine & Original Products
● EVM LM01 A3 metal laminator with knob EU plug
(roller diameter 19mm)
● Voltage frequency : 220V 50/60Hz
● Power : 620W
● Preheating time : 3-5min
● Operating temperature : 80-180°C
● Number of rollers : 4 Pcs
● Max laminating thickness: 1mm
● Max laminating width : 330mm A3
● Max laminating speed : 0.35m/min
● Dimensions(mm) : 450x175x92mm